Repair To Existing Equipment

If Customers request any material change/upgrade, Dunn engineering is required to perform new mechanical design to current Asme Code

Detailed Scope of repairs*:
Text Field. 4000 Words
Detailed Drawing of equipment being repaired
File must be less than 15 MB
Manufacturer U-1 Report and/or Design Data Sheet
File must be less than 15 MB
Mean Metal Temp for fixed tube sheet exchangers to check thermal expansion:
Only Numbers
Customer Specs / Include Paint Specs (if required)
File must be less than 15 MB
Delivery Requirements
Contact Name*
Free Text, Max 50 Character
Contact Number*
Contact Email*
Free Text, Max 50 Character
Company Name
Free Text, Max 50 Character
Company Location
Free Text, Max 20 Char
Free Text, Max 20 Char
Notes
Free Text, Max 4000 words